Russia, Republic of Bashkortostan, Gafuriysky district
``Sigma Drakon`` SPP, 15 MW
1.23 KT of steel structures
44,784 photovoltaic modules (PVM)
Work period: September 2020 – November 2020
- Design of steel structures
- Fabrication of steel structures
- Application of protective coating (hot galvanising)
- Installation of steel structures and photovoltaic modules