Russia, Republic of Bashkortostan, Gafuriysky district

``Sigma Drakon`` SPP, 15 MW

1.23 KT of steel structures
44,784 photovoltaic modules (PVM)
Work period: September 2020 – November 2020

  • Design of steel structures
  • Fabrication of steel structures
  • Application of protective coating (hot galvanising)
  • Installation of steel structures and photovoltaic modules