Russia, Stavropol Territory, Grachevsky district

``Staromaryevskaya`` SPP, 100 MW

9,80 KT of steel structures
350,868 photovoltaic modules (PVM)
Work period: February 2019 – January 2020

  • Design of steel structures
  • Fabrication of steel structures
  • Application of protective coating (hot galvanising)
  • Installation of steel structures and photovoltaic modules