Russia, Astrakhan
``Zavodskaya`` SPP, 15 MW
1,5 KT of steel structures
56,626 photovoltaic modules (PVM)
Work period: January 2017 – May 2017
- Design of steel structures
- Fabrication of steel structures
- Application of protective coating (hot galvanising)
- Installation of steel structures and photovoltaic modules